The right to mine conditions:a ore distribution plate evenly dispersed in the crushing cavity.
b into the ore Light Weight Block Machine can not be higher than the level of rolling acetabular wall (as shown in Figure 15)
(2) the maximum crusher to the ore size, are not allowed equal Copper flotationto the size of the entrance to the mine, = 85% (to the maximum size of the ore block to the mine mouth size) otherwise it will lead to:
lower yield of a crusher.
b crusher certain parts of the damage.
(3) crushers are not allowed to load start, load startup will cause an accident.
(4) parking, you must stop feeder and into the crushing chamber ore crusher, crusher Parking.
(5) crusher work should frequently check the pressure of the locking system and hydraulic station, identify problems in time.
2 crusher Yield
The production of the crusher, feed, feed blocks degree related to theball mill row nuggets of size, physical and mechanical properties of the ore, temperature range, factory production given in the conditions specified under the outline throughput.
3. Replacement of rolling acetabular wall
Rolling acetabular wall u-shaped screw adjustment ring between injection of zinc alloy, so closely integrated, new installation or replacement of rolling acetabular wall, after 6-8 hours of work should examine their retention, u-shaped screw and tighten again.
Replacement of the cone crusher wall
Cone Crusher wall is tapered head fixed to the tapered torso, between cast zinc alloy, new installation orball mill new replacement cone crusher wall after 6-8 hours of work should examine their retention should immediately found loose fastening.
5 gear meshing
Circular plate wear due to friction, affecting the gear changes in the gap, in order to ensure the normal engagement of the gear must be supplemented in the bottom cover gasket,rotary dryer spacer thickness should be equal to the amount of wear of the circular plate.
6. Bowlic bearing and sealing means