SCOTTSDALE, AZ--(Marketwired - November 19, 2015) - Cupric Canyon Capital ("Cupric") is pleased to announce that its wholly owned subsidiary, Khoemacau Copper Mining Pty. Limited ("KCM"), has completed the current phase of drilling on its Zone 5 deposit and has updated feasibility work for its assets in Botswana. Timothy Snider, Cupric's Chairman, said, "This most recent drilling and feasibility work has established Zone 5 as one of the most attractive new copper projects in the world. The resource that we have defined so far contains approximately 100 million tonnes of high grade copper/silver ore. Favorable geology and metallurgy, combined with both our recent acquisition of the nearby fully functional Boseto mill and a competent and supportive government, provide a clear path to begin production with very favorable capital intensity in 2018. We are also very excited about the numerous additional exploration targets we have identified on our expansive land position."
Summary of Results
·Updated Resource
oThe Zone 5 resource (JORC 2012 compliant) now totals an estimated 100.3 million tonnes of measured, indicated, and inferred ore grading 1.95% copper and 20 grams per tonne silver.
oTotal contained metal includes 2.0 million tonnes of copper and 64 million ounces of silver.
oThe strata-bound orebody with an average width of 10 meters, a strike length of 4.2 kilometers, a dip of 56 to 60 degrees and competent stratigraphy lends itself to low- cost underground mining with no back-fill required.
oThe orebody, in which ore is first encountered at 70 meters below the surface, remains open at depth and along strike. Recent deep drilling at 1,200 meters below surface continues to show high grades and wide intercepts.
·Near Term Production, Low Capital Development Alternative - Zone 5
In order to establish a plan for near term initial production from this developing copper district, a feasibility study has been completed that demonstrates the viability of utilizing the recently acquired Boseto mill to process Zone 5 ore. Capital expenditures of $350 million are required to (a) develop three interconnected underground mines along strike in the Zone 5 orebody to extract 10,000 tonnes of ore per day, (b) construct an ore transportation system over a distance of approximately 30 kilometers, and (c) expand the Boseto mill. This operation will produce annually about 50,000 tonnes of copper and 1.4 million ounces of silver contained in concentrate grading 42% copper. The mine life is 27 years. C-1 cash production cost, net of by-product credits, is estimated to be in the range of $1.05 to $1.10 per pound of copper, which is in the lowest quartile of the industry cost curve. Capital intensity of $6,460 per tonne of annual copper equivalent production is about half of the industry average for brownfield projects of $12,000.
·Maximum Sustainable Production Development Alternative - Zone 5
CONTACT INFORMATION
·For further information, contact:
Rodney A. Prokop
Chief Financial Officer
Cupric Canyon Capital
Scottsdale, Arizona
Tel: +1 (480) 607 7030
Email: ccc@cupriccanyon.com