Canada’s PMI Ventures has announced that drilling has begunon its Ashanti II Deep Gold project in Ghana, West Africa.
An initial programme, consisting of 1 050 m of diamond drilling in
eight to ten holes, is planned.
The fconcrete pulverizer supplier in india, concrete crusher for rental,priceirst target being tested is in the Grid B area of the Fromenda
concession.
Other drill targets lie along strike in the old Kukunapi Mine area,
on the Gemap concession, located 20 km southwest of the Fromenda
Grid B area, and in the Fromenda Grid A area, where geophysical
analysis and testing has identified previously unexplored sulphide
mineralised quartz reefs.
At the Ashanti Obuasi mine, located 40 km to the east of the
project area, similar type gold sulphide quartz reef mineralisation
occurs in raking ore shoots that generally average less than 200 m
in length, four to 30 m in width, and may extend to depths greater
than two kilometres.
The aim of this drill programme, the company says, is to confirm
the previous trench and rotary percussion drill results, extend the
zones to depth, and determine the rake direction of the gold
mineralisation.
Additional diamond drilling and exploration work on the project
area will be based upon the results from this initial drill
programme.
PMI has an option to earn up to 85% of the interest that Goknet
Mining Company of Accra, Ghana, holds in exploration concessions
and applications covering an area of some 400 sq km, along a length
of 50 km of the axis of the Asankrangwa Gold Belt in south western
Ghana.
Goknet’s interests vary from 85% to 100%, subject to a 10%
non-participating interest in favour of the government of Ghana.