freePRnow.com Plans | Login    

Author Details
linkcrusher linkcrusher
www.orecrushers.net

Drilling starts on Ghana gold prospect


Drilling starts on Ghana gold prospect

freePRnow.com, 10/09/2012 - Canada’s PMI Ventures has announced that drilling has begun

on its Ashanti II Deep Gold project in Ghana, West Africa.

An initial programme, consisting of 1 050 m of diamond drilling in

eight to ten holes, is planned.

The fconcrete pulverizer supplier in india, concrete crusher for rental,priceirst target being tested is in the Grid B area of the Fromenda

concession.

Other drill targets lie along strike in the old Kukunapi Mine area,

on the Gemap concession, located 20 km southwest of the Fromenda

Grid B area, and in the Fromenda Grid A area, where geophysical

analysis and testing has identified previously unexplored sulphide

mineralised quartz reefs.

At the Ashanti Obuasi mine, located 40 km to the east of the

project area, similar type gold sulphide quartz reef mineralisation

occurs in raking ore shoots that generally average less than 200 m

in length, four to 30 m in width, and may extend to depths greater

than two kilometres.

The aim of this drill programme, the company says, is to confirm

the previous trench and rotary percussion drill results, extend the

zones to depth, and determine the rake direction of the gold

mineralisation.

Additional diamond drilling and exploration work on the project

area will be based upon the results from this initial drill

programme.

PMI has an option to earn up to 85% of the interest that Goknet

Mining Company of Accra, Ghana, holds in exploration concessions

and applications covering an area of some 400 sq km, along a length

of 50 km of the axis of the Asankrangwa Gold Belt in south western

Ghana.

Goknet’s interests vary from 85% to 100%, subject to a 10%

non-participating interest in favour of the government of Ghana.

 

Plans | FAQs | Contact Us | Terms & Conditions | Privacy Policy